Out of sight from either construction cam, work has begun constructing the walls that form the rooms in the lower level, including six new children’s classrooms. Trades people carefully measured and marked the location of the classrooms and fellowship hall that are directly below the sanctuary. Metal tracks are first fixed to both the ceiling and floor. Then vertical metal studs are installed which form the wall structure on which sheet rock will be hung. The rough plumbing, for bathrooms and sinks within the classrooms, was previously installed below the concrete floors.