Outside the view of our balcony construction camera, work continues on the lower level. The walls have been framed and all rough electrical and plumbing is complete. With an in-wall inspection sign-off, drywall has been hung throughout the lower level. Tape and mud has been applied and sanded throughout the lower level. Fire suppression lines have been hung from the ceiling. Furnaces have been installed in the lower level furnace room. Some HVAC duct work is installed with the fellowship hall yet to be completed. Over the nex two weeks the walls will receive a coat of primer paint.