Foundations for the music wing expansion were excavated and poured.
Read More
The concrete team formed, poured and leveled the new chancel steps.
Read More
Masons have begun to build the sanctuary walls, block by block.
Read More
A crane lifted large concrete planks into place, forming the new sanctuary floor.
Read More
A new 4″ concrete floor was poured across the entire lower level on August 16, 2021.
Read More
Pouring the basement floor and installing the church floor are next up.
Read More
Completed rough plumbing and electrical work makes way for new basement floor.
Read More